Support for the Extension of Accident Risk Spots Inventory and Preventive Measures / Final Report
Annex 11
Pilot studies on Know How Transfer for the Safety
Measures of CS









Pilot Project:
Contaminated Sites
in Potentially Flooded
Areas
28th Meeting of the APC EG in Ljubljana, September 8-10th
Outcomes of the Project
· Ranking of potentially contaminated sites in the
Danube region
· Recommendation on Safety Requirements on
OCS in potentially flooded areas
· Checklist for the investigation of contaminated
sites in flooded areas
· Site visit at Copsa Mica, Romania
·Proposal for a Pilot Project
28th Meeting of the APC EG in Ljubljana, September 8-10th
1








Finding of the site visit
· Adaptation of the recommendation
· Adaptation of the checklist
· Need of further developing the checklist
· Need of training and know how for managing old
contaminated sites
· Need of further measures at the sites
28th Meeting of the APC EG in Ljubljana, September 8-10th
Pilot project on know how transfer for
safety measures at OCS
Objective
·To enhance the experience of the responsible authorities to improve
the safety level of old contaminated sites in potentially flooded areas
·To use a pilot site as training site to
· implement exemplary site investigations
· develop a measure plan
· implement exemplary measures
28th Meeting of the APC EG in Ljubljana, September 8-10th
2








Which Pilot Site ?
· An an exemplary site, where several hot spots
occur and different services for the investigation or
the treatment of those hot spots are needed
· A site with high suspected risk
· A site where accession and investigation rights
are guaranteed
28th Meeting of the APC EG in Ljubljana, September 8-10th
Content of the Project
1. Training of country expert at an exemplary site:
· Preparatory measures
· Site investigations
· Measure development
· Exemplary implementation
· Monitoring and site surveillance
28th Meeting of the APC EG in Ljubljana, September 8-10th
3








Content of the Project
2. Adaptation of the Checklists
3. Preparation of an agreed guideline for country
experts
4. Multiplication of the findings
Estimated costs: 200.000-230.000
28th Meeting of the APC EG in Ljubljana, September 8-10th
Conclusion
Due to the need of know how in concerning the
treatment of old contaminated sites we would
recommend to implement a pilot project for the
know how and technology transfer for further
investigations and safety measures at an old
contaminated site.